The light beam tunnel for UT2

The almost finished light beam tunnel coming out of UT2 heading for the delay line tunnel. The concrete lids had just been put on top. The UT1 enclosure itself was undergoing the last fine tuning and commissioning. This involved adjusting and testing the computer control of the enclosure mechanisms including the enclosure rotation, shutter, windscreen and cooling liquid system. The UT1 enclosure looks more and more like a real telescope enclosure and less like a construction site. Construction and assembly work also continued on the UT2-3-4 enclosures which, at the time, where in progressive states of completion.

Credit:

ESO

Over de afbeelding

Id:eso9712e
Type:Fotografisch
Publicatiedatum:2 juni 1997
Gerelateerde berichten:eso9712
Grootte:504 x 756 px

Over het object

Naam:Paranal
Type:Unspecified : Technology : Observatory
Categorie:Paranal

Afbeeldingstypen

Grote JPEG
144,1 KB

Achtergrond

1024x768
239,4 KB
1280x1024
337,4 KB
1600x1200
415,9 KB
1920x1200
432,3 KB
2048x1536
562,9 KB