Opening of the ELT secondary blank mould
Opening of the ELT secondary mirror blank mould, containing the still very hot ZERODUR® glass at first annealing. The blank was transferred from the SCHOTT melting facility to the SCHOTT 4-metre blank annealing facility in Mainz, Germany in May 2017. The casting of this mirror is a major step towards building the world’s biggest eye on the sky, one of ESO’s greatest feats.
Credit:SCHOTT/ESO
About the Image
Id: | eso1715k |
Type: | Photographic |
Release date: | 22 May 2017, 12:00 |
Related releases: | eso1715 |
Size: | 5760 x 3840 px |
About the Object
Type: | Unspecified : Technology |
Category: | ELT |
Image Formats
Large JPEG
3.6 MB
Publication TIFF 4K
13.3 MB
Publication JPEG
2.1 MB
Screensize JPEG
227.4 KB