Grid connection to Paranal and Armazones

ESO has signed an agreement with the company Grupo SAESA to connect its sites at Cerro Paranal and Cerro Armazones to the Chilean electric power grid. The new connection will reduce costs and provide greater reliability and stability, as well as reduce the observatory’s carbon footprint.

This image shows the path of the grid connection from Paposo to Paranal and Armazones.

Kredit:

ESO

O snímku

Id:ann14049a
Typ:Kresba
Datum zveřejnění:19. června 2014 18:50
Související oznámení:ann14049
Velikost:4217 x 3406 px

O objektu

Jméno:Cerro Armazones, Cerro Paranal
Typ:Unspecified : Technology : Observatory
Kategorie:ELT
Paranal

Image Formats


Zvětšovatelný


Pozadí

1024x768
434,3 KB
1280x1024
712,9 KB
1600x1200
1,0 MB
1920x1200
1,2 MB
2048x1536
1,6 MB